Civil & environmental projects

Infrastructure that protects the places people use.

Bank stabilization, dredging, restoration and site works for conservation authorities, municipalities and industrial owners — delivered with minimal environmental impact and full regulatory compliance.

2 kmWatercourse restored, Brampton
4Featured projects
TRCARepeat conservation-authority client
Commercial Civil & environmental
Completed works
Aerial view of completed slope stabilization and new trail at Centennial Park
Toronto and Region Conservation Authority

Centennial Park Trail Protection

Bank stabilization and protective trail infrastructure for a 100-metre by 9-metre at-risk trail slope near the Etobicoke Creek West Branch, ensuring long-term stability of the trail corridor. Multiple new asphalt trails were built for community use as part of erosion mitigation.

Extent
100 m × 9 m
Role
Prime contractor
Completed
2026
Bank stabilizationErosion mitigationAsphalt trails
Completed works
Aerial view of restored trail and stabilized bank along the West Humber River
Toronto and Region Conservation Authority

Carabram Park West Humber River Trail Protection

Bank stabilization and trail protection for an at-risk trail segment along the West Humber River — erosion control, turbidity curtain, rip rap, landscape restoration, tree planting and two new asphalt trails. Required coordination with TransCanada Pipeline and Enbridge to secure a Ground Clearance Agreement.

Partners
TRCA · City of Brampton
Role
Prime contractor
Completed
2025
Rip rapTurbidity curtainTree plantingUtility coordination
Excavator working along the Evergreen Estate watercourse with coir log erosion control installed
Excavator removing accumulated sediment from the Evergreen Estate watercourse
TRCA · City of Brampton

Evergreen Estate Dredging & Restoration

Engaged by the City of Brampton to complete dredging and restoration along approximately two kilometres of watercourse in Castlemore and Goreway — among the most prominent neighbourhoods in the GTA — removing accumulated sediment and vegetation to improve drainage and flow, with work carried out behind existing estate homes.

Extent
~2 km
Role
Prime contractor
Completed
2026
DredgingSediment removalErosion controlRestoration
Dredging, restoration & site works

More civil & environmental work

Toronto and Region Conservation Authority

Heath to Simpson Pond Dredging & Restoration

One kilometre of dredging and sediment removal, removal of invasive Phragmites, dewatering and fish rescue, with erosion control mats installed throughout. Adjacent to the Brampton Transit bus loop and works yard, requiring careful traffic control.

DredgingInvasive species removalFish rescueTraffic control
Extent
1 km
Role
Prime contractor
Completed
2025